Posted by [email protected] on August 11, 2017 at 2:15 PM Comments comments (0)

Things are moving slow but steady on the layout re-construction. The final townsights switch machines are being wired into the control panels. Some wiring between the switch panels and relay clusters is being shortened. Work is on-going on wiring in some structural lighting on the refinery. And, more in view, scenery is being worked on adding ground color, dirt textures, grass and shrubs to sections of the layout. Check out a few new photos in the Photo Gallery.

March 2017 Update

Posted by [email protected] on March 4, 2017 at 4:40 PM Comments comments (0)

Over the last few months many improvements have been made on the layout. Some cannot be seen, such as electrical, while other are more visible. Rework of the bus lines under Cimarron have been complete and work has been started under the refinery, steel mill and Port Allen area. The switch panels for Port Allen and Steel mill receiving trackage have been completed and added to the facade. The switch panels for St. Charles yard have been reworked and are now fully functional.


...

Read Full Post »

February 6th, 2016

Posted by [email protected] on February 7, 2016 at 5:45 PM Comments comments (0)

CMRRC Newsletter Update

I thought I would give you an update on some electrical problems that we didn't know we had have now been corrected since the newsletter release.

Last Thursday night Dale discovered that on the center peninsula the two power supplies were somehow connected together by mistake.

 

The peninsula has an upper level line and lower level line with a power supply for each. In addition each side of the peninsula has an upper and lower power bus. T...

Read Full Post »

October 2015 Events

Posted by [email protected] on October 10, 2015 at 4:20 PM Comments comments (0)

On October 3rd, 2015 we had the first 'formal" operating session on the new layout. We had 11 members of a guest round robin group come and beta test the layout. Not all the layout was functional but it seemed like they had a grand time and we learned where some of the problems were. They are now being fixed.


On October 10th, 2015 the Handley Center had an open house and a few members come out to run trains around the layout since the Center also wanted to show off the upst...

Read Full Post »

Layout Re-Construction progress

Posted by [email protected] on June 21, 2015 at 4:45 PM Comments comments (0)

We now have six (6) Easy DCC receivers up and operating in a tempory area. They will soon be installed in their final location. There are fourteen (14) throttles up and functioning. The Command Station, Extenders, and Power Boosters are all up and functioning. The throttle cabinet has been installed.


As for the layout most if not all electrical drops to the main buses are in with the exception of the staging yard tracks. These will soon be connected. The track is very dirty...

Read Full Post »

Past Club History

Posted by [email protected] on February 2, 2015 at 12:35 AM Comments comments (0)

In 2011 a Dallas based company called Element-X Creative was involved in an ad contest which if won would grant then a bunch of money and the opportunity to work on a project with movie director Ridey Scott on a project. Element-X created a video for the AICP called Stop. Watch. Love and used our old (LMRA RR Club) layout as the backdrop. While they claimed that they would give the layout some credit, it didn't appear in the final video.


At any rate, here is the URL for th...

Read Full Post »

New Year News

Posted by [email protected]ash.net on January 21, 2015 at 11:40 AM Comments comments (0)

Happy 2015!


The year started out well for the CMRRC as we cleared out a lot of material that wasn't going to be used from the layout room. All of the new layout "footprint" has been constructed. The general plan is falling into shape and more track has been put down. We are probably a month or two away from having the mainlines laid. The track will go fairly easy but getting the electrical drops and main buses in will take time due to limited manpower.


On...

Read Full Post »

Re-Construction Update

Posted by [email protected] on November 19, 2014 at 10:20 AM Comments comments (0)

As of November 19, 2014


We are still fighting to clear up floor space. There is still a lot of "stuff" (reminents of the old layout) that needs to be incorportated or removed (thrown out).


Work is progressing on the center penninsula. New substructure has been expanded and backdrop placed on the segments. Track repair is on-going at the areas where the layout was sectioned. One new townsite has had the track laid do...

Read Full Post »

Layout Reconstruction Update

Posted by [email protected] on May 26, 2014 at 4:05 PM Comments comments (0)

As of May 26th 2014


All major sections of the layout that will be used in the reconstruction have been moved to the Handley Center. A few other sections are being disassembled for parts.


Cimarron: the sections that make up Cimarron yard have been refitted with legs and rejoined and will form the north wall area of the layout room. The track cuts are currenting being repaired. No electrical reconnections have been made on this section yet. The...

Read Full Post »

Reconstruction Work Schedule

Posted by [email protected] on April 2, 2014 at 8:10 PM Comments comments (0)

Beginning April 10th ALL work sessions, unless otherwise advised, will be at the Handley Center.

The published work schedule is as follows:


     Saturday Work Schedule: the 2nd and 4th Saturday from 9:00 AM - Noon

                          ...